Root infiltrations from failed liners at lateral connections
Projects
Los Angeles, CA
The R125 crawler with WJ125 water jet module, was used to remove the root infiltrations that this failed liner could not prevent from infiltrating this 6 inch (150mm) sewer mainline.
Request online demonstration
Thank you for your online demonstration request.
Your preferred date and time will soon be reviewed and login to the online meeting shared. We are looking forward to meeting you.