Introducing our latest box intergrations Our new Box Integrations 70028 & 70029 are engineered to support demanding field operations with a strong focus on efficiency, reliability, and operator comfort. Both units feature full sound insulation in the workspace, including the…
The Colus Specialist Projects Team has been working at the Ibrox Stadium, the home for the Scottish Champions ‘The Rangers’, at their new museum, removing 12m of concrete running up to 100% in a 450mm pipe.
How to remove a failed or collapsed CIPP liner? Simply with High Pressure Water Jet Cutting.
Years of hydrogen sulfide gasses accelerated the corrosion of this 300mm (12”) sewer pipeline, leaving it heavily tuberculated with the upstream manhole in a very bad shape. No problem for Daito CO., LTD., who accepted the challenge with a smile.