Root infiltrations from failed liners at lateral connections

Projects
Los Angeles, CA

The R125 crawler with WJ125 water jet module, was used to remove the root infiltrations that this failed liner could not prevent from infiltrating this 6 inch (150mm) sewer mainline.

Request online demonstration

Time UTC+1:

Come meet us

We are present at various international events and even host our own

Notable events

Notable events

Request online demonstration

Thank you for your online demonstration request.

Your preferred date and time will soon be reviewed and login to the online meeting shared. We are looking forward to meeting you.

Best regards,
Sewer Robotics
info@sewerrobotics.com
+3174 289475
+1 503 504 8474